Annual Inspection and calibration of all instruments. On Flare Ignition Panel TSL (SWITCH TEMPERATURE LOW WEST HP FLARE)


TASKS TO BE PERFORMED:

1. Inspection of Wellhead Control Panel.
2. Inspect Panels for any external damage.
3. Check Panels are securely mounted.
4. Check all tubing and conduit are secured properly and undamaged.
5. Inspect all Panel Indicators and Instruments for any damage.
6. Check panel interior for damage and cleanliness.
7. Close panels ensuring all fastenings are tightened correctly.
8. Check all panel seals ensuring no damage has occurred.
9. Ensure the status of the alarms are correct.
10. Clean Panel as required.
11. Sign-off Work Permit and return to operations.
12. Report all findings to supervision and document in CMMS.


Commentaires

Posts les plus consultés de ce blog

Metering BS&W Monitor/Probe Verification/Calibration: AIT TRANSMITTER ANALYZER LACT QUALITY SKID

Annual Inspection and calibration of Temperature Switch High High TSHH

Yearly Metering & Flow Computer Totalizer Check FQI (FLOW TOTALIZER FLOW COMPUTER LACT UNIT)