Annual Inspection and calibration of Temperature Switch High High TSHH
TASKS TO BE
PERFORMED:
1. Annual
Inspection and calibration of Temperature Switch High High.
2. Inspect
Switch for any physical damage.
3. Ensure
Switch is securely mounted.
4. Check
temperature Switch and thermowell are securely fastened.
5. Inspect
electrical cable and conduit for any physical damage.
6. Check Switch
covers are secure.
7. Isolate
Switch.
8. Remove to
workshop for calibration if required.
9. Connect
multimeter set to read resistance to the switch output terminals.
10. Place
sensing bulb in temperature bath and adjust the bath temperature slowly to the
specified alarm temperature.
11. Check the
switch operates at the correct set point, adjust as required.
12. Reduce
temperature setting on bath and ensure switch resets, note the amount of hysteresis
on the switch.
13. If
adjustments are made, repeat steps 9 to 12 till correct set point is achieved
14. Complete
Instrument Calibration Sheet.
15. On
competition refit switch in plant.
Remove to
workshop for calibration if required
9. Connect
multimeter set to read resistance to the switch output terminals.
10. Place
sensing bulb in temperature bath and adjust the bath temperature slowly to the
specified alarm temperature.
11. Check the
switch operates at the correct set point, adjust as required.
12. Reduce
temperature setting on bath and ensure switch resets, note the amount of
hysteresis on the switch.
13. If
adjustments are made, repeat steps 9 to 12 till correct set point is achieved.
14. Complete
Instrument Calibration Sheet.
15. On
competition refit switch in plant.
16. Connect
Millivolt or Decade box to input terminals of switch. (TC or RTD).
17. Inject
signal and slowly increase until signal reaches setpoint.
18. Check that
switch has operated and alarms has been received at control room.
19. Adjust
switch as required until desired setpoint is achieved.
20. Reduce
input signal slowly until switch resets and note the amount of hysteresis present.
21. Ensure the
hysteresis is within the required specifications of the switch.
22. Remove test
input signal and reconnect switch.
23. De-isolate
sensing lines.
24. Return
Switch to service.
25. Sign-off
Work Permit and return to operations.
26. Report all
findings to supervision and document in CMMS.